THE DEPARTMENT of Energy (DoE) is set to offer a total of 10,478 megawatts (MW) of renewable energy (RE) capacity, which includes some that will be paired with battery energy storage systems (BESS), under the fourth round of the green energy auction (GEA-4) program.